How to Apply for a Septic Permit
A Permit is required
before beginning construction, alteration, major repairs and improvements to
your septic system.
Deep hole soil tests are required
in the proposed septic system location.
Forms and Regulations are
now on line for your convenience:
Subsurface Sewage Disposal Regulations (18 page .pdf,
1Mb)
Forms for
Septic System Work and Lot Testing (3 page .pdf, 493 Kb)
Townsend
Well Regulations (7 page .pdf, 299 Kb)
Septic System Work and Lot Testing Forms are filed
with Nashua Associated Boards of Health, 30 Central Ave, Ayer
978-772-3335
The
Board of Health would like to remind all homeowners, when or if you plan on
selling your home, please be sure to get a Title V inspection and a Water
Quality Test plus Radon as soon as possible. Each report is valid for 2
years from the report date. A Title V report can be extended for an
additional year if you provide two annual pumping receipts. Don't let a
surprise ruin your sale or put off your closing date.
Board
Of Health
Phone
978-597-1713 Fax 978-597-8135
|